top of page
Updates


ProSense Instruments Expertise Powering Australia with Trusted Global Brands
Its strength is not based on one product category or one function inside the business. It comes from a wider team that understands the full path from product selection to delivery, commissioning support, documentation, and long-term service. Reliable instrument selection starts with practical technical knowledge. A diverse team with practical roles across the full customer journey A strong instrumentation business depends on more than technical data sheets. Customers also nee
Nov 9


What Is Daily Light Integral and Why Does It Matter in Crop Monitoring
What Is Daily Light Integral and Why Does It Matter in Crop Monitoring
Oct 14


How to Orient Antennas and Sensor Position for Best Wireless Range
How to Orient Antennas and Sensor Position for Best Wireless Range
Oct 12


What Is Instrumentation and Control in Industrial Plants
What Is Instrumentation and Control in Industrial Plants
Oct 11


Planning an Industrial Data Logging System with Reliable Sensors and Recovery
Planning an Industrial Data Logging System with Reliable Sensors and Recovery
Oct 10


Understanding 4–20 mA Signals in Industrial Instrumentation
Understanding 4–20 mA Signals in Industrial Instrumentation
Oct 9


Flow Meter Pulse Outputs Explained: K Factors Totalisers and Flow Rate Calculations
Flow Meter Pulse Outputs Explained: K Factors Totalisers and Flow Rate Calculations
Oct 9


Thermocouple Guide for Industrial Temperature Measurement
Thermocouple Guide for Industrial Temperature Measurement
Oct 8


How to Connect a Flow Meter to a PLC, Display or Data Logger
A flow meter can be installed perfectly in the pipe and still give the wrong reading at the PLC. The cause is often simple: the output type, wiring, power supply, or scaling does not match the receiving device. Compare flow-meter selection requirements Compare flow technologies and equipment Plan a complete flow-monitoring system Connecting a flow meter is not only an electrical task. The meter must suit the process, the pipe must stay full where required, the flow direction
Oct 8


Selecting Monnit Monitoring Points for Rental and Temporary Facilities
Temporary sites create a monitoring problem that permanent buildings rarely have. The space may be yours for three months, the walls may not be yours at all, and the internet connection may be basic, shared, or missing. Yet the risks are real. Stock can overheat in hired storage, project materials can get damp, portable equipment can lose power, and a temporary unit can sit unattended for long stretches. Compare Monnit sensor and gateway requirements Browse Monnit equipment P
Oct 7


How to Specify Panel Meters for a New Industrial Switchboard with Acrel and ProSense Instruments
How to Specify Panel Meters for a New Industrial Switchboard with Acrel and ProSense Instruments
Oct 6


Using Monnit to Catch Doors Left Open After Hours
Using Monnit to Catch Doors Left Open After Hours
Oct 6


How to Choose the Right Pressure Transmitter for Industrial Applications
How to Choose the Right Pressure Transmitter for Industrial Applications
Oct 5


PT100 Sensor Guide: RTD Temperature Measurement, Wiring, and Accuracy
PT100 Sensor Guide: RTD Temperature Measurement, Wiring, and Accuracy
Oct 5


How to Add Electrical Measurement to Existing BMS or SCADA Systems with Acrel via ProSense Instruments
How to Add Electrical Measurement to Existing BMS or SCADA Systems with Acrel via ProSense Instruments
Oct 5


Residual Current Monitoring for Industry: Key Specs Buyers Must Define
Residual Current Monitoring for Industry: Key Specs Buyers Must Define
Oct 4


Acrel Meter Selection Guide for Generator and Mains Monitoring
Acrel Meter Selection Guide for Generator and Mains Monitoring
Oct 3


Acrel Meter Commissioning CT Ratios Phase Mapping and Reading Checks for Accurate Readings
Acrel Meter Commissioning CT Ratios Phase Mapping and Reading Checks for Accurate Readings
Oct 2


Using Acrel Meter Data to Compare Production Shifts and Output
A factory can make the same number of parts on two shifts and still use very different amounts of electricity. That gap is where useful questions start. Did one shift run longer? Was a compressor left on during a break? Did a machine spend too much time idling? Was product mix different? Monthly utility bills cannot answer those questions. They show the total, not the pattern. To compare shifts fairly, electricity records need to sit beside two other records: operating hours
Oct 2


Acrel Meter Commissioning CT Ratios Phase Mapping and Reading Checks
Acrel Meter Commissioning CT Ratios Phase Mapping and Reading Checks
Oct 1
bottom of page
