top of page

Energy monitoring and submetering: a project selection guide

3 days ago
1 min read

Useful energy monitoring starts with the question you need to answer: total consumption, tenant allocation, equipment demand, peak load or power quality.


Define the measurement

Record single or three phase, supply voltage, maximum current, circuits to monitor, mounting space and whether direct connection or CT measurement is needed. Identify the reporting period and required electrical measurements.


Match the meter and CTs

Check CT ratio, secondary type, aperture, accuracy and compatibility with the selected meter. Incorrect CT settings, orientation or phase association can produce misleading readings. Confirm wiring and commissioning requirements with your electrical contractor.


Connect the reporting system

Choose local display, pulse, RS485 Modbus, Ethernet or cellular communications as supported by the exact model. Allow for gateways, power supplies, antennas, data service and software configuration.


Scope the installation

Send a switchboard photo, circuit count, phase arrangement, current ratings, CT dimensions and communications requirements. Billing or regulatory use requires separate confirmation of the exact meter's suitability; monitoring capability alone does not establish it.





Need help with your application?

For instruments and product selection, visit ProSense Instruments, email sales@prosenseinstruments.com.au or call 1800 560 854.


For monitoring and automation projects, visit ProSense Solutions or email sales@prosense.com.au.


For software enquiries, visit ProSight Software or email info@prosightsoftware.com. Confirm integration requirements for the exact instruments and system.

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page