top of page
Dragino PS-LB-NA Pulse Counts: Verify Restart Persistence and Reporting Mode
Counting mode and restart persistence are separate settings. Build a controlled acceptance test that checks the raw count and its interpretation after maintenance.
9 hours ago
Vented Level Sensors: Protect the Atmospheric Reference Before Adjusting Zero
A connected level sensor can still have an unreliable pressure reference. Check the documented vent arrangement before adjusting offsets or replacing the probe.
1 day ago
Industrial Monitoring Handover: Build a Point-by-Point Acceptance Pack
Create a practical monitoring handover pack that connects each sensor to its engineering units, dashboard point, alarm owner and acceptance evidence.
2 days ago
Monnit Pending Settings: Confirm a Configuration Has Reached the Sensor
Saving a change in iMonnit does not prove that the sensor has received it. Use transaction status, communication evidence and a careful recovery record to verify the result.
2 days ago
bottom of page
