The meter’s display looks sensible, yet its Modbus power tag is wrong by a fixed factor. Before adjusting a CT ratio, check whether the selected register reports secondary-side watts or primary-side kilowatts. A decoded number is incomplete evidence until its unit and measurement basis are known.

Key takeaway: Record the source unit, primary/secondary basis and each conversion separately. Apply the transformer ratio only where the exact register definition requires it. |
1 Identify the exact map before changing a scale
Start with the complete fitted model, input arrangement, firmware identification where available and the applicable communications document. ProSense’s ACREL three-phase meter listing covers an ADL400 family with different variants. A family name alone does not prove that a particular register exists or has the same meaning on every supplied meter.
In Acrel’s ADL400(MID) T317 manual, revision T1.4, section 9.2 distinguishes floating-point secondary data without transformer multiplication from primary data that includes it. Its table lists total active power at 5318H in W on the secondary basis, and at 081AH in kW on the primary basis. Both are Float entries with a four-byte length. Verify these definitions against the actual unit before using them.
This is a read-only data-validation task. Electrical installation, panel access and application-specific verification belong to appropriately qualified people following current requirements and site procedures. Do not open CT circuits, alter wiring or change a live control setting to make a software trend look right.
2 Separate decoding, units and transformer treatment
Build a short conversion record for each tag. Keep the address notation used by the manual alongside the addressing convention expected by the driver. Record the function, data type, byte/word interpretation, source unit, measurement basis and destination unit. Preserve the raw response used for the check.
Treat three questions separately: did the driver reconstruct the intended numeric value, did it convert the unit correctly, and did it apply any required CT/PT multiplication exactly once? Combining all three into one unexplained multiplier makes later replacements harder to verify.
If the incoming value is already a primary kW value, another CT multiplier can create a second scaling error. If the incoming value is secondary W, relabelling it as primary kW skips both the basis decision and the unit conversion. Neither problem is corrected by adding decimal places to a dashboard.
3 Compare two paths using a controlled example
Hypothetical example: the verified configuration has CT ratio 50 and PT ratio 1. At a stable operating point, a correctly decoded secondary power value is 100 W. Applying the agreed ratios gives 100 × 50 × 1 = 5000 W; converting watts to kilowatts gives 5 kW.
An equivalent primary-side reading is already 5 kW in this example. Multiplying that value by 50 again produces 250 kW. The software may display a smooth trend while being wrong. These illustrative numbers are not measured results, default meter settings or a substitute for the supplied unit’s documentation.

Compare readings over the same observation period. Loads can change between polls, so a pair of values taken at different times is weak evidence of an exact scaling error. Retain timestamps and repeat the comparison under suitably stable, authorised conditions.
4 Test the conversion without rewriting history
Save the existing driver map, raw samples, units, ratios and conversion locations before making a change.
Replay representative saved responses in an authorised offline test environment. Check the decoded number before any engineering conversion.
Test the unit conversion and transformer treatment independently, including a non-unity ratio so an accidental duplicate multiplier is visible.
Confirm the destination tag’s name, unit and quality status, then compare its result with the agreed reference on the same basis.
Record the effective time and approved configuration revision. Keep historical correction or recalculation separate from the live-map change.
A fixed discrepancy suggests a scaling issue but does not establish one. Wrong register selection, address-offset interpretation, data type, word order or a mismatched reference can also produce believable values. If the evidence does not agree, leave the tag unvalidated and resolve the uncertainty before using it for decisions.
5 Hand over a tag definition, not just a number
Keep the register-map revision and a small paired raw/decoded/engineering-value example with the commissioning record. State which system owns each conversion: driver, gateway, historian or presentation layer. A later integrator should be able to reproduce the result without guessing what a multiplier meant.
Send ProSense the exact meter identification, applicable manual, current CT/PT configuration and a timestamped sample from the receiving system. Those details support a useful equipment or integration enquiry. Do not assume that every meter or gateway is directly compatible with ProSight Software; integration must be checked separately.
Need help with your application?
ProSense Instruments - discuss metering equipment and product selection. ProSense Solutions - plan monitoring and automation integration. ProSight Software - explore software requirements and verified integration options.
Instrument enquiries: sales@prosenseinstruments.com.au | 1800 560 854. Project enquiries: sales@prosense.com.au. Software enquiries: info@prosightsoftware.com.



Comments